How Long Does It Take to Install a lift?

Do you want to know how long it takes to install a lift? In this article we will tell you. Do you need one in the Balearic Islands? Contact us.

Do you want to improve the accessibility of your building and are you interested in installing a lift? One of the first questions that arises is how long the whole process will take. The duration of a lift installation can vary considerably depending on various factors such as the type of building, the chosen lift model, local regulations and the complexity of the work.

Below, we will provide you with an overview of the process, the factors that influence the time it takes to install a lift, and the steps you should follow to ensure a successful project.

Phases of installing a lift

Installing a lift is a process that requires careful planning and the intervention of qualified professionals. Adapting a building for a lift is a structured project that includes several phases, each with its own set of tasks. Here we present the most important phases of installing a lift .

Study and design of the project

The first phase is the initial study of the project, where the specific needs of the client and the building are evaluated. During this process, the technicians will analyze if it has enough space for the installation. and what type of lift is best suited. 

This is also the time when key decisions are made regarding design and finishes. This phase can take between one and two weeks, depending on the complexity of the project and how quickly the necessary permits are obtained.

Obtaining licenses and permits

Once the lift design has been decided, it is mandatory to obtain the corresponding licenses and permits, a step that may vary in time depending on the municipality and local regulations. 

In Spain, the timeframes for receiving these permits can range from several weeks to a few months.. The speed of this process will depend largely on the efficiency of the town hall and the correct presentation of the necessary documents.

Preparation of the work

At this stage, the building space is prepared for the installation of the lift. Depending on the construction, whether it is new or already existing, this stage can be more or less complex. 

It consists of adapting the building's space to accommodate the lift. This may include the demolition of structural elements, the creation of reinforcements and the adaptation of electrical and mechanical installations.

In a new building, preparation is quicker. However, in older buildings it may involve modifying walls, ceilings or building a pit, which can lengthen the time phase for installing a lift from two to four weeks.

Lift installation

With the space prepared the lift installation takes place. This process requires the placement of the rails, the cabin, the motor and the electrical and control systems. The duration of this phase depends on the type of lift. For example, the hydraulic lifts are usually quicker to install than electric ones. In general, this phase can last between one and three weeks.

Testing and commissioning

Once installed, the lift must go through a series of safety and performance testing before it can be used. This includes checking that all electrical systems are working properly, that doors open and close properly, and that security mechanisms respond to potential emergencies. This stage usually lasts about a week.

Time to install a lift

The time to install a lift can vary depending on multiple factors. Firstly, the type of lift plays an important role. 

The electric lifts, although more common, may require more time to install than hydraulic ones. While the former rely on complex electrical systems, hydraulic ones are usually simpler to assemble and maintain.

Another key aspect is the type of building in which the lift will be installed. In new buildings, the time to install a lift is usually shorter because it is planned from the design phase. On the other hand, in older buildings, the installation may take longer due to possible modifications, such as creating a shaft for the lift or adapting the electrical infrastructure.

The size and complexity of the lift also influences the time it takes to install a lift. A panoramic or high-capacity lift may take longer to install than a standard one. Also, if it is a custom lift with special features, the manufacturing and adjustment time may be longer.

Bureaucratic procedures also play a crucial role in the overall project time. In Spain, the process of obtaining licenses and permits can be long, especially if the building is protected or located in an area with specific regulations. This process can extend the duration to several months if not managed efficiently.

In summary, the time to install a lift can range from three to six months, depending on these factors. The most important thing is to plan properly and complete the paperwork on time to avoid unnecessary delays.

At Eleva Balear we are specialists in installing lifts

Do you want to improve your building, but are worried about the amount of time to install a lift? At Eleva Balear, we do not only install lifts, but we also offer you solutions in record time that adapt to your needs. With years of experience in the installation, repair and maintenance of lifts in the Balearic Islands, we guarantee fast, efficient and quality work.

Our team of experts will take care of the entire process, from design, installation and final testing, ensuring that the lift operates optimally and complies with all current regulations. In addition, we will help you manage all the necessary legal procedures so you don't have to worry about anything.

Whether you need a lift for a new building or to modernize an old one, at Eleva Balear we have the perfect solution for you. Visit our website and request a personalized consultation today. Take the step towards better accessibility with Eleva Balear!